Postwar houses on Lilac Street in Greenfield, Pittsburgh

Pittsburgh ADU Rules Change as Council Passes Zoning Bill

Pittsburgh’s new ADU rules could let more homeowners add a backyard cottage, a basement apartment or an in-law suite. On October 27, 2026, City Council gave final approval to a zoning bill that opens the door to accessory dwelling units, or ADUs, across the city. The same bill ends parking minimums for new development and swaps the city’s long-debated affordable housing mandate for a voluntary bonus.

The bill is number 2025-1545. The city scheduled Mayor Corey O’Connor’s signature for October 29, according to its Housing Needs Assessment project page.

What an ADU Is

An ADU is a second, smaller home on the same lot as a main house. The city’s definition covers an apartment inside the house, a separate building out back, or a converted garage or basement. On a typical Pittsburgh lot, that could mean a small house off a back alley, a finished attic with its own entrance, or a basement unit with its own kitchen.

Before this bill, the city’s main test of ADUs was a 2018 overlay for the single-family parts of Garfield, which was set to expire after two years. The bill that just passed keeps the ADU plan the Department of City Planning announced in September 2024, which allows ADUs citywide.

Row of houses on Penn Avenue in Garfield, home of Pittsburgh's 2018 ADU overlay

Details such as maximum size and where on a lot an ADU can sit are written into the bill itself. Read those before you sketch plans, and talk to the Department of City Planning about your lot.

Parking Minimums Are Gone

Pittsburgh has required off-street parking for new buildings since its 1958 zoning code. The new bill removes those parking minimums for new development along with the reductions that used to be allowed. Builders now decide how much parking a project needs.

For homeowners, the change matters most near busy business districts. New apartment buildings there may come with little or no parking, which can mean more competition for spots on the street.

What Happened to Inclusionary Zoning

This bill started out very differently. In September 2024, the city proposed taking its inclusionary zoning overlay citywide. That overlay already covered Lawrenceville, Bloomfield, Polish Hill and most of Oakland. Under the plan, new or renovated buildings with 20 or more units would have had to set aside 10% of their units as affordable to people earning 50% or less of the area median income.

In October 2025, council replaced that mandate with an optional bonus. Here is how the two versions compare:

September 2024 proposal Bill passed October 27, 2026
Affordable units, citywide Required: 10% in buildings of 20+ units Optional, in exchange for a bonus
Existing overlay areas Still required Still required
What builders get No bonus Extra height or density
How long units stay affordable Not stated in the 2024 summary 35 years

Builders who choose to include affordable units can build taller or denser than zoning would normally allow. In neighborhood commercial and neighborhood office districts, though, the bonus height tops out at 30 feet. Council added that limit at its October 21 committee meeting.

How Council Got Here

The housing plan came to council in two pieces. The first, Bill 2025-1579, removed the minimum lot area required per housing unit and cut minimum lot sizes in residential districts. Council approved it in May 2025, and it is already in effect.

The second piece is this bill. It went to a public hearing on September 23, 2026. On October 21, the Standing Committee added amendments and moved it forward, and final approval came on October 27.

Before You Add an ADU

For most owners, the ADU change is the part that hits home. A lot that can hold a second unit gives you choices. You could rent it out to help with the mortgage, move a parent in close by, or give a grown child a place of their own. Some buyers may also start looking for lots with room for one. ADUs are one of the housing fixes we looked at in Pennsylvania’s housing shortage explained.

Building one still takes real money and planning. Expect to need zoning sign-off, building permits, new utility connections and a contractor. Older Pittsburgh houses often bring surprises once walls and floors open up. If the main house already needs a roof, a furnace or foundation work, an ADU may not make sense until those are handled.

Keep the tax side in mind as well. A finished ADU adds living space, and new construction can raise a property’s assessed value, which means a higher property tax bill. If you rent the unit out, that rent is income you’ll need to report. Talk to your tax preparer before you build so the numbers don’t surprise you later.

Houses on Bausman Street in Pittsburgh's Knoxville neighborhood

FAQs About Pittsburgh’s ADU and Zoning Bill

Can I build an ADU in Pittsburgh now?

The bill allows ADUs citywide once it takes effect. Size limits and placement rules are in the bill text, and you still need city zoning approval and permits. Check with the Department of City Planning before you start.

Does Pittsburgh still require parking for new buildings?

No. The bill removes parking minimums for new development, so builders decide how much parking a project needs.

Which Pittsburgh neighborhoods still require affordable units?

The existing inclusionary zoning overlay areas. When the city proposed going citywide in 2024, that overlay covered Lawrenceville, Bloomfield, Polish Hill and most of Oakland.

When do Pittsburgh’s new ADU and parking rules take effect?

Council gave final approval on October 27, 2026, and the city scheduled the mayor’s signature for October 29. Confirm the effective date with the Department of City Planning before you apply for permits.

Thinking About Your Next Move?

New zoning rules open doors for some owners. For others, the house needs more work than an ADU is worth. We buy houses across Pittsburgh as-is, whether yours needs a new roof, has a damp basement or is full of a lifetime of belongings.

There’s nothing to fix and nothing to clean out, and we pay the closing costs. Request a no obligation cash offer and see where you stand before you decide.